-
On Friday January 22nd, we moved Southern Wind from the dock where we have been working for months in Palm Coast, 30 miles north up the Intracoastal Waterway to St. Augustine for a haul-out and two weeks of yard work at St. Augustine Marine Center before we sail for Haiti. Haiti has always been our fist planned destination, and ever since the earthquake we have been frantically trying to finish our work on Southern Wind and set sail. The Rotary Club here has raised money for additional fuel–normally we would travel under sail as much as possible to avoid using too much fuel, but people are more important than diesel and when we depart, we will travel with all sails up and both engines pushing hard all the way to Haiti.
Our project is designed to deliver medical supplies where there are no ports, so the devastation in Haiti’s commercial ports will not deter us from going. Also, we originally planned to sail on from Haiti, but we are leaving some of our field gear here in Florida to make foom for additional supplies and volunteers. Our friend Veronica from Rotary has a bus that we can store our surplus gear in and collect when we return to Florida to drop off Volunteers and take on new arrivals before departing for Central America.
St. Augustine Marine Centers 100ton Travellift
First, though, we had to get Southern Wind safely out of the canal where she has lain for ten years, over the 6-foot bar between our canal and the intracoastal, and safely up the intracoastal to the marine yard in St. Augustine for a haul out the next m0rning. Southern Wind is a BIG boat–70 tons, and this would be our first time feeling how she moves in the water. Captain Ryan Emberley, our friend from West Marine in Jacksonville, was aboard to pilot the ship safely on the maiden voyage of her rebirth after years of exposure to weather and slowly dying in her quiet canal.
We were to dock at St. Augustine Marine’s long dock on arrival, stay there the weekend, and haul Monday morning. We calculated that at 10 knots and no problems, the 30 mile run to St. Augustine could TECHNICALLY be made in 3 hours, but even though I think all of us figured there was no way things would go that smoothly, none of us anticipated the Three Hour Tour we would all experience over the next 72 hours.
Besides working so hard for so long, besides our desire to put our project into action, despite the earthquake in Haiti that has us chomping at the bit to set sail, we had one additional reason to want to move Southern Wind out of her canal–lots and lots of dead fish. A record cold snap (of course, right? While we were here in Palm Coast, we have had record floods, record cold…what’s next?) kept the temperature around or below freezing for days on end, and the canals got so cold that THOUSANDS of fish–mostly catfish, but also snook, jacks, mullet, needlefish–froze to death, and in the two slightly warmer days of preparation to move Southern Wind, all their rotting bodies floated onthe surface and the tides and wind brought ALL the canals’ dead fish down into our blind end canal.
Continue reading The Southern Wind Leaves Her Dock in Palm Coast For The Last Time…